Three young men installing one of the “poles” into the hole they have made in the bottom, the water is about 4-1/2 ft deep.
Installing the “stringers” on the first side, working off of a raft.
The decking is in place, the ends of each piece still need to be trimmed.
They are installing the uprights for the handrail, the dock platform is in place.
It’s done !!
Radio to home page
comments to anchor@ec.rr.com
this page was last revised on 08/03/2004